Maintenance
COMPLETED
Brake shoes replaced
Radiator removed and repair
Batteries replaced – solar panel installed
Starter replaced (several times)
New control labels in cab
Corroded brake pipes repaired
Cylinder head gasket replaced
Fuel system serviced
Air compressor replaced with a bigger one
ONGOING
Vacuum braking is in the final stages of installation
Bodywork maintenance